+971 56 389 7151

Mon-Fri: 8:00 - 18:00 UAE

Email:

DWYER MTF multitube flow system

Customize flow systems to meet application requirements. Systems can be configured with up to six different flow tubes with various flow capacities and flow patterns. The Series MTF Multitube Flow Systems are ideal for multichannel metering, mixing, or monitoring applications.

			int(5995)
NULL
		

Made in USA. brand DWYER, model MTF

International delivery to United Arab Emirates, Kuwait, Qatar, Saudi Arabia, Saudi Arabia, Bahrain, Oman and other Middle Eastern countries.
Our warehouses are located in UAE. Delivery to other countries (Europe, North and South America, Asia, Africa) is discussed individually.

Retail price from $106

Available

Available

Download the questionnaire

Founded in 1931, DWYER manufactures equipment for measurement, conversion and control – pressure, temperature, level, flow.

Advantages

Only the best I&C brands

Our company is a UAE supplier of control and measuring instruments from well-known world brands

Advantages

Discounts for organisations

We sell high-tech equipment at best prices. We provide really advantageous conditions for partners

Advantages

Fast delivery across the Middle East

Supply to United Arab Emirates, Kuwait, Qatar, Saudi Arabia, Bahrain, Oman and other countries

Advantages

Professional advice on device selection

Our specialists are ready to advise you on any technical question. We can find an analogue of any device

Description of DWYER MTF

To Customize your flow system:

  1. Determine the flow pattern required for the application.
  2. Select a 65 mm or 150 mm frame, along with the appropriate number of tubes required, flow pattern, and wetted parts. Choose a 150 mm Gas Proportioner Frame (Series MTP) to blend the 2 or 3 gases at required concentrations. Gas proportioner frames are typically used at 50 psi.
  3. Choose the appropriate 65 mm or 150 mm correlated flow tubes, for air or water.
  4. Select a valve cartridge if desired that matches the range of the flow tube.Note: Refer to catalog page under Support Library tab in order to ensure the purchase of a complete part.

Technical specifications of DWYER MTF

  • Scales: Universal 65 mm or 150 mm scales with correlation charts.
  • Accuracy: Accuracy: *Correlated Flow Tubes: +/- 2% FS @ 70 deg F (21.1 deg C) and 14.7 psia (1 atm absolute); Direct Reading Flow Tubes: +/- 5% FS @ 70 deg F (21.1 deg C) and 14.7 psia (1 atm absolute). *Models FT-61, FT-62, FT-123, and FT-124 have an accuracy of +/- 5% FS @ 70 deg F (21.1 deg C) and 14.7 psia (1 atm absolute).
  • Repeatability: ±0.25% of scale reading.
  • Turn-down Ratio: 10:1, 20:1 with combinations of two floats installed in meter.
  • Maximum Operating Pressure: 200 psig (13.8 bar).
  • Maximum Operating Temperature: 250°F (121°C).
  • Mounting: Vertical.
  • Connection: 1/8″ female NPT.
  • Flowtube: Borosilicate glass.
  • Float: 316 stainless steel or black glass as indicated.
  • Float Stops: PTFE.
  • End Fittings: Anodized Aluminum or 316 stainless steel.
  • Front Shield: Polycarbonate.
  • Side Panels: Black, anodized aluminum.
  • O-rings: Buna-N on aluminum models and Fluoroelastomer on stainless steel models.
  • Wetted Parts: 6-turn Valves: For Aluminum Frames: aluminum body, 316 SS spindle, Acetal orifice, Buna-N o-rings; For 316 SS Frames: 316 SS body, 316 SS spindle, PCTFE orifice, fluoroelastomer o-rings. 16-turn Valves: For Aluminum Frames: brass body, 316 SS spindle, PCTFE orifice, Buna-N o-rings; For 316 SS Frames: 316 SS body, 316 SS spindle, PCTFE orifice, fluoroelastomer o-rings.

Prices for

Model Description Availability Price Qty Buy
FT-123 150 mm correlated flow tube, max. flow rate 19 mL/min air (0.19 mL/min water), glass float. Delivery time from 12 weeks from 184$
-
+
FT-124 150 mm correlated flow tube, max. flow rate 61 mL/min air (0.94 mL/min water), 316 SS float. Delivery time from 12 weeks from 184$
-
+
FT-125 150 mm correlated flow tube, max. flow rate 49 mL/min air (0.53 mL/min water), glass float. Delivery time from 12 weeks from 184$
-
+
FT-126 150 mm correlated flow tube, max. flow rate 137 mL/min air (2.45 mL/min water), 316 SS float. Delivery time from 12 weeks from 184$
-
+
FT-127 150 mm correlated flow tube, max. flow rate 92 mL/min air (0.90 mL/min water), glass float. Delivery time from 12 weeks from 184$
-
+
FT-128 150 mm correlated flow tube, max. flow rate 264 mL/min air (4.70 mL/min water), 316 SS float. Delivery time from 12 weeks from 184$
-
+
FT-129 150 mm correlated flow tube, max. flow rate 374 mL/min air (5.50 mL/min water), glass float. Delivery time from 12 weeks from 184$
-
+
FT-130 150 mm correlated flow tube, max. flow rate 814 mL/min air (20.4 mL/min water), 316 SS float. Delivery time from 12 weeks from 184$
-
+
FT-133 150 mm correlated flow tube, max. flow rate 2313 mL/min air (54 mL/min water), glass float. Delivery time from 12 weeks from 184$
-
+
FT-134 150 mm correlated flow tube, max. flow rate 4562 mL/min air (130 mL/min water), 316 SS float. Delivery time from 12 weeks from 184$
-
+
FT-137 150 mm correlated flow tube, max. flow rate 8676 mL/min air (210 mL/min water), glass float. Delivery time from 12 weeks from 184$
-
+
FT-138 150 mm correlated flow tube, max. flow rate 16737 mL/min air (506 mL/min water), 316 SS float. Delivery time from 12 weeks from 184$
-
+
FT-139 150 mm correlated flow tube, max. flow rate 22536 mL/min air (541 mL/min water), glass float. Delivery time from 12 weeks from 210$
-
+
FT-242 150 mm direct reading flow tube, max. flow rate 1.50 SCFM air, 316 SS float. Delivery time from 12 weeks from 213$
-
+
FT-244 150 mm direct reading flow tube, max. flow rate 2.50 SCFH air, carboloy float. Delivery time from 12 weeks from 184$
-
+
FT-245 150 mm direct reading flow tube, max. flow rate 5.00 SCFH air, glass float. Delivery time from 12 weeks from 184$
-
+
FT-247 150 mm direct reading flow tube, max. flow rate 8.25 SCFH air, glass float. Delivery time from 12 weeks from 184$
-
+
FT-249 150 mm direct reading flow tube, max. flow rate 16.5 SCFH air, 316 SS float. Delivery time from 12 weeks from 184$
-
+
FT-251 150 mm direct reading flow tube, max. flow rate 23.0 SCFH air, carboloy float. Delivery time from 12 weeks from 194$
-
+
FT-253 150 mm direct reading flow tube, max. flow rate 50.0 SCFH air, glass float. Delivery time from 12 weeks from 183$
-
+
FT-254 150 mm direct reading flow tube, max. flow rate 90.0 SCFH air, 316 SS float. Delivery time from 12 weeks from 183$
-
+
FT-255 150 mm direct reading flow tube, max. flow rate 94.0 SCFH air, 316 SS float. Delivery time from 12 weeks from 183$
-
+
FT-61 65 mm correlated flow tube, max. flow rate 6 mL/min air (0.07 mL/min water), glass float. Delivery time from 12 weeks from 110$
-
+
FT-611 65 mm correlated flow tube, max. flow rate 1249 mL/min air (27 mL/min water), glass float. Delivery time from 12 weeks from 131$
-
+
FT-612 65 mm correlated flow tube, max. flow rate 2520 mL/min air (71 mL/min water), 316 SS float. Delivery time from 12 weeks from 131$
-
+
FT-613 65 mm correlated flow tube, max. flow rate 2040 mL/min air (40 mL/min water), glass float. Delivery time from 12 weeks from 131$
-
+
FT-614 65 mm correlated flow tube, max. flow rate 3990 mL/min air (108 mL/min water), 316 SS float. Delivery time from 12 weeks from 131$
-
+
FT-617 65 mm correlated flow tube, max. flow rate 6318 mL/min air (147 mL/min water), glass float. Delivery time from 12 weeks from 131$
-
+
FT-618 65 mm correlated flow tube, max. flow rate 12058 mL/min air (364 mL/min water), 316 SS float. Delivery time from 12 weeks from 131$
-
+
FT-62 65 mm correlated flow tube, max. flow rate 17 mL/min air (0.28 mL/min water), 316 SS float. Delivery time from 12 weeks from 110$
-
+
FT-621 65 mm correlated flow tube, max. flow rate 23168 mL/min air (522 mL/min water), glass float. Delivery time from 12 weeks from 157$
-
+
FT-622 65 mm correlated flow tube, max. flow rate 42094 mL/min air (1261 mL/min water), 316 SS float. Delivery time from 12 weeks from 157$
-
+
FT-63 65 mm correlated flow tube, max. flow rate 49 mL/min air (0.55 mL/min water), glass float. Delivery time from 12 weeks from 110$
-
+
FT-64 65 mm correlated flow tube, max. flow rate 145 mL/min air (2.38 mL/min water), 316 SS float. Delivery time from 12 weeks from 110$
-
+
FT-67 65 mm correlated flow tube, max. flow rate 202 mL/min air (2.6 mL/min water), glass float. Delivery time from 12 weeks from 110$
-
+
FT-68 65 mm correlated flow tube, max. flow rate 522 mL/min air (12.0 mL/min water), 316 SS float. Delivery time from 12 weeks from 131$
-
+
FT-741 65 mm direct reading flow tube, max. flow rate .60 SCFM air, carboloy float. Delivery time from 12 weeks from 158$
-
+
FT-743 65 mm direct reading flow tube, max. flow rate 2.2 SCFH air, glass float. Delivery time from 12 weeks from 110$
-
+
FT-746 65 mm direct reading flow tube, max. flow rate 6.0 SCFH air, glass float. Delivery time from 12 weeks from 110$
-
+
FT-748 65 mm direct reading flow tube, max. flow rate 10.0 SCFH air, 316 SS float. Delivery time from 12 weeks from 110$
-
+
FT-750 65 mm direct reading flow tube, max. flow rate 18.0 SCFH air, 316 SS float. Delivery time from 12 weeks from 110$
-
+
FT-752 65 mm direct reading flow tube, max. flow rate 25.0 SCFH air, 316 SS float. Delivery time from 12 weeks from 110$
-
+
FT-753 65 mm direct reading flow tube, max. flow rate 50.0 SCFH air, 316 SS float. Delivery time from 12 weeks from 110$
-
+
FT-754 65 mm direct reading flow tube, max. flow rate 90.0 SCFH air, 316 SS float. Delivery time from 12 weeks from 157$
-
+
FV-11 Standard valve, 6-turn, flow rate 0-5000 mL/min air (0-125 mL/min water). Delivery time from 12 weeks from 106$
-
+
FV-12 Standard valve, 6-turn, flow rate 5001-10000 mL/min air (126-325 mL/min water). Delivery time from 12 weeks from 106$
-
+
FV-13 Standard valve, 6-turn, flow rate 10001 and above mL/min air (326 and above mL/min water). Delivery time from 12 weeks from 106$
-
+
FV-21 Standard valve, 6-turn, flow rate 0-5000 mL/min air (0-125 mL/min water). Delivery time from 12 weeks from 143$
-
+
FV-22 Standard valve, 6-turn, flow rate 5001-10000 mL/min air (126-325 mL/min water). Delivery time from 12 weeks from 143$
-
+
FV-23 Standard valve, 6-turn, flow rate 10001 and above mL/min air (326 and above mL/min water). Delivery time from 12 weeks from 143$
-
+
FVH-11 High precision valve, 16-turn, flow rate 0-200 mL/min air (0-6 mL/min water). Delivery time from 12 weeks from 194$
-
+
FVH-12 High precision valve, 16-turn, flow rate 201-400 mL/min air (7-12 mL/min water). Delivery time from 12 weeks from 194$
-
+
FVH-13 High precision valve, 16-turn, flow rate 401-1000 mL/min air (13-26 mL/min water). Delivery time from 12 weeks from 194$
-
+
FVH-14 High precision valve, 16-turn, flow rate 1001-2500 mL/min air (27-80 mL/min water). Delivery time from 12 weeks from 194$
-
+
FVH-15 High precision valve, 16-turn, flow rate 2501-6200 mL/min air (81-200 mL/min water). Delivery time from 12 weeks from 194$
-
+
FVH-16 High precision valve, 16-turn, flow rate 6201 and above mL/min air (201 and above mL/min water). Delivery time from 12 weeks from 194$
-
+
MTF-1121 150 mm frame, isolated pattern, 2 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 426$
-
+
MTF-1122 150 mm frame, common pattern, 2 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 496$
-
+
MTF-1131 150 mm frame, isolated pattern, 3 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 510$
-
+
MTF-1132 150 mm frame, common pattern, 3 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 657$
-
+
MTF-1141 150 mm frame, isolated pattern, 4 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 741$
-
+
MTF-1142 150 mm frame, common pattern, 4 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 1 603$
-
+
MTF-1152 150 mm frame, common pattern, 5 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 995$
-
+
MTF-1161 150 mm frame, isolated pattern, 6 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 1 038$
-
+
MTF-1162 150 mm frame, common pattern, 6 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 1 169$
-
+
MTF-1621 65 mm frame, isolated pattern, 2 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 309$
-
+
MTF-1622 65 mm frame, common pattern, 2 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 372$
-
+
MTF-1631 65 mm frame, isolated pattern, 3 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 384$
-
+
MTF-1632 65 mm frame, common pattern, 3 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 484$
-
+
MTF-1641 65 mm frame, isolated pattern, 4 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 496$
-
+
MTF-1642 65 mm frame, common pattern, 4 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 581$
-
+
MTF-1651 65 mm frame, isolated pattern, 5 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 596$
-
+
MTF-1652 65 mm frame, common pattern, 5 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 710$
-
+
MTF-1661 65 mm frame, isolated pattern, 6 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 692$
-
+
MTF-1662 65 mm frame, common pattern, 6 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 854$
-
+
MTF-2121 150 mm frame, isolated pattern, 2 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 864$
-
+
MTF-2122 150 mm frame, common pattern, 2 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 886$
-
+
MTF-2131 150 mm frame, isolated pattern, 3 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 1 294$
-
+
MTF-2132 150 mm frame, common pattern, 3 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 1 382$
-
+
MTF-2141 150 mm frame, isolated pattern, 4 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 1 682$
-
+
MTF-2142 150 mm frame, common pattern, 4 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 1 825$
-
+
MTF-2151 150 mm frame, isolated pattern, 5 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 2 078$
-
+
MTF-2152 150 mm frame, common pattern, 5 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 2 227$
-
+
MTF-2162 150 mm frame, common pattern, 6 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 2 785$
-
+
MTF-2621 65 mm frame, isolated pattern, 2 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 796$
-
+
MTF-2622 65 mm frame, common pattern, 2 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 841$
-
+
MTF-2631 65 mm frame, isolated pattern, 3 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 1 084$
-
+
MTF-2632 65 mm frame, common pattern, 3 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 1 200$
-
+
MTF-2641 65 mm frame, isolated pattern, 4 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 1 440$
-
+
MTF-2642 65 mm frame, common pattern, 4 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 1 583$
-
+
MTF-2651 65 mm frame, isolated pattern, 5 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 1 800$
-
+
MTF-2652 65 mm frame, common pattern, 5 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 1 942$
-
+
MTF-2661 65 mm frame, isolated pattern, 6 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 2 150$
-
+
MTF-2662 65 mm frame, common pattern, 6 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 2 297$
-
+
MTP-113 150 mm gas proportioner frame, 3 tube capacity, aluminum wetted parts. Delivery time from 12 weeks from 697$
-
+
MTP-212 150 mm gas proportioner frame, 2 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 636$
-
+
MTP-213 150 mm gas proportioner frame, 3 tube capacity, 316 SS wetted parts. Delivery time from 12 weeks from 1 093$
-
+
VA81 High precision valve, 16-turn, flow rate 0-200 mL/min air (0-6 mL/min water). Delivery time from 12 weeks from 311$
-
+
VA82 High precision valve, 16-turn, flow rate 201-400 mL/min air (7-12 mL/min water). Delivery time from 12 weeks from 311$
-
+
VA83 High precision valve, 16-turn, flow rate 401-1000 mL/min air (13-26 mL/min water). Delivery time from 12 weeks from 311$
-
+
VA84 High precision valve, 16-turn, flow rate 1001-2500 mL/min air (27-80 mL/min water). Delivery time from 12 weeks from 311$
-
+
VA85 High precision valve, 16-turn, flow rate 2501-6200 mL/min air (81-200 mL/min water). Delivery time from 12 weeks from 311$
-
+
VA86 High precision valve, 16-turn, flow rate 6201 and above mL/min air (201 and above mL/min water). Delivery time from 12 weeks from 310$
-
+
Expand Table

User Guide and Instruction manual for DWYER MTF

You can request the necessary certificates, documentation, instructions and user guide for DWYER MTF using the special form.

You can buy DWYER MTF in UAE at a price starting from 106 $ in «Texair FZCO» by leaving a request on the website, by phone +441225535040 or by email . DWYER MTF price are subject to change depending on exchange rates. We deliver instruments by transport companies in United Arab Emirates, Kuwait, Qatar, Saudi Arabia, Saudi Arabia, Bahrain and other Middle Eastern countries.

Generate an article by selecting the parameters below
Article:
MTF-
Quantity:
-
+
Material of Wetted Parts
Scale
Number of Capacity Tubes
Flow pattern
Clear
I know the article / Need help
Get Offer
The article is not fully generated. Please double-check the selected values.